1) You do not need to type in your name in the space in the top-left area above. The results of this study guide will not be sent to your teacher.
2) Carefully read each question and all the answer choices.
3) Select the correct letter from the drop-down feature to the left of each question.
4) When you are finished, click the “Check Your Work” button in the bottom-left corner of the page.
5) The software will grade your work, and then it will show you the results. Note that the correct answer will be displayed beneath the questions.
6) Keep doing the study guide over until you earn a 100 on it.
 

 1. 

You are frustrated that your cell phone battery does not seem to last very long. So you hire a team of electrical engineers to design a new type of cell phone battery. To make this battery last longer, they must devise a way to reduce the amount of electrical current draining the battery’s charge.
mc001-1.jpg
Which tool would they most likey use to measure the electrical current?
a.
electron microscope
b.
pH Indicator
c.
ammeter
 

 2. 

A bottle company discovered that caps were being applied with too much force. This caused many bottles to break. Engineers adjusted the capping device so it applies less force to the caps.
Which steps should the engineers take before the adjustment is considered successful?
a.
replace the bottle caps with different caps that cover a larger bottle opening
b.
inspect bottles that have passed through the capping device after the adjustment
c.
compare their capping machine to similar machine in other factories
 

 3. 

An engineering company is testing a new weather-forecasting program.
Which procedure would best verify that the program is making accurate predictions?
a.
using the program to verify events not related to weather
b.
using the program to verify past weather-related events
c.
comparing the predictions of the program to the actual weather
 

 4. 

A student built an electric generator prototype. The generator was designed to give power to electrical devices.
How can the student best test the strength of the generator?
a.
place a magnet on a spring scale and record the force of the magnetic field
b.
place the generator on an electronic balance, and record its mass in kilograms
c.
connect the generator to a circuit that contains appliances and then observe if the appliances work
 

 5. 

A student built a prototype of an electromagnet. The electromagnet was designed to produce a strong magnetic field.
How can the student best test the strength of the electromagnet?
a.
connect the electromagnet to a simple circuit that contains a battery and light bulb, and then observe if the bulb glows
b.
place a thermometer near the electromagnet, and record changes in the air temperature surrounding the electromagnet
c.
attach an iron bar to a spring scale, place the iron bar near the electromagnet, and record the force reading on the spring scale
 

 6. 

Students are to build a model bridge using toothpicks and wood glue. The design of the bridge must support a specific weight and measure 20 centimeters long.
mc006-1.jpg
Which tools would best help determine if the model bridge meets the design requirements?
a.
hammer, string, and nails
b.
string, beaker, and water
c.
ruler, weights, and string
 

 7. 

A team of engineers are designing a new type of shark cage to enable marine biologist to study the feeding behaviors of Great White sharks up close. The cage must be strong enough to protect the diver inside, but it also can not be excessively heavy.  
mc007-1.jpg
What is one safe way that they can test this prototype shark cage?
a.
For their first test, they should place a Great White shark inside the cage to determine if it can break out of the cage.
b.
For their first test, they should put a person in the cage. Then they should lower the cage into a tank full of angry Great White sharks.
c.
Place raw meat inside the cage in a bag, and then lower the cage into a tank of hungry  sharks to see if they can smash through the bars.
 

 8. 

Students are building a prototype toy car and a circular race track using small blocks of wood and long boards. The length of the race track must be exactly 6 meters, and the mass of the car must be between 12 to 15 grams. Also, the toy car must travel around the track one complete circuit in less than 10 seconds. 
Which of the following tools would best determine if the car and race track meets the design requirements?
a.
a meter stick, a triple-beam balance, and a stopwatch
b.
pliers, a saw, 6 meters of string, and a stopwatch
c.
a saw,  a beaker, a triple-beam balance, and a flask full of water
 

 9. 

A company designed an electromagnetic tool that removes dents from metal plates. The dented metal is placed between two magnets. An electric current is then supplied to the electromagnets. The attraction between the two magnets forces the dented metal plate back into place.
How can engineers test to see if their design is successful?
a.
compare the type of metal plates treated by the company to those of other companies
b.
compare the cost of operating the tool to other dent removal tools
c.
compare the shape of the treated metal with the original shape of the metal
 

 10. 

Two engineering students at a nearby university are designing a new type of bicycle tire for racing bikes. Their goal is to make this tire weigh at least 30% less than pre-existing tires in order to enable cyclists to go faster.
mc010-1.jpg
mc010-2.jpg
mc010-3.jpg
Which pair of tools would work  best for testing this bicycle tire prototype?
a.
a triple-beam balance and a stopwatch
b.
A stopwatch and spring scale
c.
A microscope and a Bunsen burner
 



 
Check Your Work     Start Over